Our Projects All Agriculture 4 Audit 64 Consultancy 53 Infrastructure 19 Mass Media 25 Power and Energy 38 Water and Irrigation 2 Power and Energy Provision of Design for Mazar IPP 220kV Switchyard – 220kV Mazar IPP-ADB-018 Consultancy Baseline Assessment for Plastic Debris flowing into Rivers and Seas of South Asia Consultancy Engineering Services for Drilling of Two Exploitation Wells in Yatimtaq Gas Field Power and Energy Third Party Monitoring (TPM) Consulting Firm for Energy Sector Projects of Asian Development Bank throughout Afghanistan Power and Energy GUARANTCO TECHNICAL ADVISOR IN RELATION TO SOLAR PROJECTS IN Audit Contract No: 47QRAA19D009Z to perform four US Generally Accepted Government Auditing Standards (GAGAS) financial and two close out audits of a major US-based contractor operating in Afghanistan Consultancy AF-MOMP-147189-CS-QCBS (NPA/MoMP/99/CS-2806/QCBS), Consulting Services for “Engineering Consultancy services for gas field facilities and gas pipeline in Afghanistan, with Phase 1 tasks includes Pre-construction surveys, developing detailed pipeline design and engineering plan, preparation environmental and social documentation, optimization of field facilities; and Phase 2 includes Project planning, management, supervision, quality assurance, technical support and training during construction” Infrastructure TA-9396 AFG: Second Support for Infrastructure Investments and Policy – Third Party Monitoring (51173-001) Load More Loading More... You’ve reached the end of the Projects
Power and Energy Third Party Monitoring (TPM) Consulting Firm for Energy Sector Projects of Asian Development Bank throughout Afghanistan
Audit Contract No: 47QRAA19D009Z to perform four US Generally Accepted Government Auditing Standards (GAGAS) financial and two close out audits of a major US-based contractor operating in Afghanistan
Consultancy AF-MOMP-147189-CS-QCBS (NPA/MoMP/99/CS-2806/QCBS), Consulting Services for “Engineering Consultancy services for gas field facilities and gas pipeline in Afghanistan, with Phase 1 tasks includes Pre-construction surveys, developing detailed pipeline design and engineering plan, preparation environmental and social documentation, optimization of field facilities; and Phase 2 includes Project planning, management, supervision, quality assurance, technical support and training during construction”
Infrastructure TA-9396 AFG: Second Support for Infrastructure Investments and Policy – Third Party Monitoring (51173-001)