Our Projects All Agriculture 4 Audit 64 Consultancy 53 Infrastructure 19 Mass Media 25 Power and Energy 38 Water and Irrigation 2 Infrastructure CONSTRUCTION OF 220KV DOUBLE CIRCUIT TRANSMISSION LINE FROM AFGHANISTAN BORDER TO HERAT CITY PHASE Power and Energy Provision of Design for Mazar IPP 220kV Switchyard – 220kV Mazar IPP-ADB-018 Power and Energy Third Party Monitoring (TPM) Consulting Firm for Energy Sector Projects of Asian Development Bank throughout Afghanistan Power and Energy GUARANTCO TECHNICAL ADVISOR IN RELATION TO SOLAR PROJECTS IN Consultancy AF-MOMP-147189-CS-QCBS (NPA/MoMP/99/CS-2806/QCBS), Consulting Services for “Engineering Consultancy services for gas field facilities and gas pipeline in Afghanistan, with Phase 1 tasks includes Pre-construction surveys, developing detailed pipeline design and engineering plan, preparation environmental and social documentation, optimization of field facilities; and Phase 2 includes Project planning, management, supervision, quality assurance, technical support and training during construction” Consultancy Consultancy Services for DABS Staff Capacity Building (NPA/DABS/96/CS-1754/QCBS) Power and Energy Independent Engineer for 10 MW Solar PV Project at Kandahar in Afghanistan Power and Energy Provision, Delivery and Assembly of 100 KVA Transformer for the Renewable Energy Degree lab at Kandahar University Load More Loading More... You’ve reached the end of the Projects
Infrastructure CONSTRUCTION OF 220KV DOUBLE CIRCUIT TRANSMISSION LINE FROM AFGHANISTAN BORDER TO HERAT CITY PHASE
Power and Energy Third Party Monitoring (TPM) Consulting Firm for Energy Sector Projects of Asian Development Bank throughout Afghanistan
Consultancy AF-MOMP-147189-CS-QCBS (NPA/MoMP/99/CS-2806/QCBS), Consulting Services for “Engineering Consultancy services for gas field facilities and gas pipeline in Afghanistan, with Phase 1 tasks includes Pre-construction surveys, developing detailed pipeline design and engineering plan, preparation environmental and social documentation, optimization of field facilities; and Phase 2 includes Project planning, management, supervision, quality assurance, technical support and training during construction”
Power and Energy Provision, Delivery and Assembly of 100 KVA Transformer for the Renewable Energy Degree lab at Kandahar University